1 . Primorsk, Rusija (From 01.06.2004 do 05.09.2004)

Reservoir of 50.000 m³

2 . Primorsk, Rusija (From 01.12.2004 do 25.03.2005)

Two reservoirs of 50.000 m³

3 . Primorsk, Rusija (From 01.04.2005 do 01.05.2005)

Two “rolled” reservoirs, 2.000 m³ each

4 . Primorsk, Rusija (From 05.04.2005 do 05.06.2005)

Pump station for fire protection system

5 . Samara, Rusija (From 10.06.2005 do 15.09.2005)

Three reservoirs of 20.000 m³

6 . Primorsk, Rusija (From 20.09.2005 do 05.11.2005)

Waste waters purifying system

7 . Kaleikin, Tatarstan (From 25.11.2005 do 20.02.2006)

Reservoir of 50.000 m³

8 . Kaleikin, Tatarstan (From 01.03.2006 do 01.04.2006)

“Rolled“ reservoir of 1.000 m³

9 . Samara, Rusija (From 10.12.2005 do 01.04.2006)

Two reservoirs of 50.000 m³

10 . Nižnji Novgorod, Rusija (From 20.04.2006 do 01.07.2006)

Reservoir of 30.000 m³

11 . Samara, Rusija (From 01.04.2006 do 23.10.2006)

Six reservoirs of 20.000 m³

12 . Lipeck, Rusija (From 25.08.2006 do 05.11.2006)

Reservoir of 50.000 m³

13 . Lipeck, Rusija (From 10.09.2006 do 10.12.2006)

Technology pipeline (Ø 1.000 mm) with connection to the reservoir

14 . Beograd, Srbija (From 10.03.2007 do 03.05.2007)

Steel construction for the recovery of Branko’s Bridge

15 . Samara, Rusija (From 15.05.2007 do 30.07.2007)

Four “rolled” reservoirs of 5.000 m³

16 . Nikoljsk, Rusija (From 03.05.2007 do 05.08.2007)

Reservoir of 20.000 m³

17 . Beograd, Srbija (From 30.06.2007 do 28.08.2007)

The steel construction of the building “Grand Casino - Yugoslavia”

18 . Aldan, Rusija (From 20.08.2007 do 20.12.2007)

Two reservoirs of 5.000 m³, three “rolled” reservoirs of 400 m³, thirteen lightning pillars and fourtheen lighting pillars

19 . Skavarodino, Rusija (From 15.01.2008 do 01.05.2008)

Technology pipeline (length 23,5 km, Ø 720 mm)

20 . Bar, Crna Gora (From 16.04.2008 do 29.06.2008)

Four aluminum floating roofs in reservoirs on the installations “Jugopetrol”

21 . Požega, Srbija (From 03.09.2008 do 25.11.2008)

Two reservoirs of 5.000 m³ for storage for the Directorate for Commodity Reserve

22 . Skavarodino, Rusija (From 01.10.2008 do 10.01.2009)

Three reservoirs of 50.000 m³

23 . Skavarodino, Rusija (From 05.01.2009 do 15.07.2009)

Four reservoirs of 20.000 m³

24 . Samara, Rusija (From 15.05.2009 do 31.07.2009)

Four reservoirs of 20.000 m³

25 . Požega, Srbija (From 03.08.2009 do 05.10.2009)

Two reservoirs of 5.000 m³ for storage for the Directorate for Commodity Reserve

26 . Talakan, Rusija (From 01.08.2009 do 10.10.2009)

Two aluminum roofs on reservoirs of 50.000 m³ and two aluminum membranes

27 . Uneća, Rusija (From 10.08.2009 do 20.02.2010)

Two reservoirs of 50.000 m³, two reservoirs of 2.000 m³ and reservoir of 400 m³

28 . Purpe, Rusija (From 15.11.2009 do 20.03.2010)

Two reservoirs of 20.000 m³ and two reservoirs of 5.000 m³

29 . Ust-luga, Rusija (From 15.05.2010 do 05.10.2010)

Four reservoirs of 50.000 m³ and technology pipeline (Ø 1.020 mm)

30 . Purpe, Rusija (From 20.05.2010 do 25.10.2010)

Three reservoirs of 20.000 m³, two “rolled” reservoirs of 2.000 m³, two “rolled” reservoirs of 425 m³, two lighting pilars and two lightning pilars

31 . Stari Banovci, Srbija (From 25.01.2010 do 15.12.2010)

Production hall “Tankmont”

32 . Habarovsk, Rusija (From 05.09.2010 do 20.12.2010)

Two reservoirs of 50.000 m³

33 . Barič, Srbija (From 15.12.2010 do 25.12.2010)

Two floating aluminum roofs VACONODeck

34 . Novi Sad, Srbija (From 12.01.2011 do 01.02.2011)

Two floating aluminum roofs VACONODeck

35 . Srbija i Crna Gora (From 09.08.2007 do 04.02.2011)

Steel constructions and subconstructions

36 . Vladivostok, Rusija (From 20.01.2011 do 15.05.2011)

Two reservoirs of 50.000 m³ and steel manholes for water and sewage system

37 . Samara, Rusija (From 05.05.2011 do 10.08.2011)

Six reservoirs of 20.000 m³, reservoir of 5.000 m³ and system of technology pipeline

38 . Primorski kraj - Habarovski kraj, Rusija (From 10.09.2010 do 30.08.2011)

Assembling of pillars for transmission lines

39 . Sofija,Bugarska (From 15.09.2011 do 02.10.2011)

Six floating aluminum roofs VACONODeck

40 . Subotica, Srbija (From 01.11.2011 do 22.12.2011)

Telecom tower

41 . Novi Sad, Srbija (From 15.02.2012 do 03.04.2012)

Two reservoirs of 2.000 m³

42 . Sremski Karlovci, Srbija (From 01.11.2011 do 05.04.2012)

43 . Krapotkin, Rusija (From 13.09.2011 do 07.04.2012)

Two reservoirs of 50.000 m³

44 . Pančevo, Srbija (NIS) (From 09.04.2012 do 27.04.2012)

Four floating aluminum roofs VACONODeck

45 . Inđija, Srbija (From 19.03.2012 do 27.04.2012)

Construction of advertising tower

46 . Novorosijsk, Rusija (From 26.05.2012 do 26.06.2012)

47 . Beograd, Srbija (From 01.06.2012 do 13.07.2012)

48 . Samara, Rusija (From 13.04.2012 do 31.08.2012)

Five reservoirs of 20.000 m³

49 . Južni Balik, Rusija (From 31.07.2012 do 15.10.2012)

Four reservoirs of 20.000 m³ and two reservoirs of 1.000 m³

50 . Zemun, Srbija (From - do 29.10.2012)

Structure and sheet metal works for Polimark

51 . Pančevo, Srbija (NIS) (From 20.08.2012 do 01.11.2012)

Repairation of three reservoirs, and installation of 3 aluminum pontoons

52 . Pančevo, Srbija (From 20.08.2012 do 01.11.2012)

Defects inspection and repair

53 . Beograd, Srbija (From 07.12.2012 do 18.12.2012)

Structure and steelwork

54 . Ufa, Baškortastan, Rusija (From 10.11.2012 do 26.01.2013)

Two reservoirs of 20.000 m³

55 . Smederevo, Srbija (From 10.11.2012 do 15.05.2013)

Two reservoirs of 5.000 m³, two reservoirs of 3.500 m³, two reservoirs of 2.500 m³, reservoir of 2.000 m³ and two reservoirs of 500 m³

56 . Samara, Rusija (From 01.04.2013 do 15.10.2013)

Four reservoirs of 20,000 m³

57 . Samara, Rusija (From 01.04.2013 do 15.10.2013)

Tehnology pipeline

58 . Smederevo, Srbija (From 28.11.2012 do 20.12.2013)

Reservoir of 60,000 m³

59 . Pirot, Srbija (From 15.09.2013 do 17.02.2014)

Structure and sub-structure

60 . Grušovaja, Rusija (From 01.12.2013 do 01.06.2014)

Four reservoirs of 30,000 m³

61 . Novi Urengoj GNPS-1, Rusija (From 01.12.2013 do 01.06.2014)

Eight reservoirs of 20,000 m³

62 . Samara, Rusija (From 06.11.2013 do 15.07.2014)

Six reservoirs of 20,000 m³; One reservoir of 50,000 m³

63 . Skovorodino, Rusija (From 05.01.2014 do 01.09.2014)

Repair of two reservoirs of 20,000 m³

64 . Purpe, Rusija (From 10.06.2014 do 15.11.2014)

Four reservoirs of 20,000 m³; Two reservoirs of 5,000 m³

65 . Malabo – Ekvatorijalna Gvineja (From 27.05.2014 do 27.11.2014)

The construction of the footbridge and roof structure

66 . Novi Urengoj, NPS-2, Rusija (From 10.01.2013 do 01.05.2015)

Ten reservoirs of 20,000 m³

67 . Kujumba GNPS-1, Rusija (From 25.11.2014 do 10.05.2015)

Four reservoirs of 20,000 m³

68 . Samara, Rusija (From 01.12.2014 do 15.05.2015)

Three reservoirs of 20,000 m³

69 . Sabeta, Rusija (From 01.08.2014 do 01.06.2015)

Four reservoirs of 160,000 m³

70 . Kujumba NPS-2, Rusija (From 01.02.2015 do 15.06.2015)

Four reservoirs of 20.000 m³

71 . Novorossiysk, Rusija (From 22.06.2015 do 25.03.2016)

Two reservoirs of 30.000 m³

72 . Ebebein - Ekvatorijalna Gvineja (From 20.03.2016 do 10.04.2016)

Construction of steel canopy

73 . Ploče, Hrvatska (From 20.10.2015 do 20.05.2016)

Four reservoirs of 10 000 m³; Three reservoirs of 5 000 m³

74 . Koper, Slovenija (From 13.12.2015 do 10.06.2016)

Two reservoirs of 20 000 m3 with containment tanks

75 . Samara, Rusija (From 08.12.2015 do 27.07.2016)

Four reservoirs of 20.000 m³

76 . Smederevo, Srbija (From 01.06.2016 do 10.01.2017)

Four reservoirs of 5 000 m³; One reservoir of 1 500 m³